• <ul id="ysmgw"></ul>
    <ul id="ysmgw"><dfn id="ysmgw"></dfn></ul>
    <fieldset id="ysmgw"><table id="ysmgw"></table></fieldset>
      Homepage      Favorite      中文版
    Home About Us News info Products Services Recruitment Contact us
    NEWS CENTER
    Company News
    Trade News
    Exhibitions
    Videos
    CONTACT US
    Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
    Tel: +86-592-6539999
    E-mail: bussiness@xmzzj.com

    NEWS CENTER
    Location:Home → News Center
    Loader operating specification
    Public date:2017-7-26   Hits:6509

    Good operating habits to extend the life of your equipment doubled

    1, bucket transport height

    ★ illegal operation: with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    ★ standard operation: the fighting state, the bottom of the bucket 40-50 cm off the ground, the slope to minimize.

    2, the operation, should make the loader straight on the front, before and after the frame should be in a straight line.

    3, prohibit the use of inertia high-speed plug into the pile, should rely on the driving force of the loader straight cut.

    4, the bucket cut into the angle is too large, all the load added to the front axle, resulting in the rear wheel vacant, prone to the front axle from the original screw teeth, axle or even the front axle support shaft fracture and other failures.

    5, prohibit the use of bucket corner digging hard materials, or prone to boom deformation, cylinder damage and other failures.

    6, the bucket inserted into the pile, you should first fight and then start the arm, or will cause the boom deformation.

    7, with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    8, can not be carried out in the high digging operations or bucket bump material, so as not to arm arm cylinder bending.

    9, after discharge, should first stop or part of the resumption of operation and then move the arm, otherwise it will cause "pull the cylinder", damage dump tank.

    10, the bucket of the block by a long time due to deformation caused by deformation, wear, the timely repair welding to ensure that the bucket of the block in the normal bar, the discharge position to play an effective limit role.

    ★ If the limit block wear is not timely repair welding, will cause rocker deformation, fracture failure!

    11, wading operations, the water does not exceed the drive axle or gearbox output shaft seal the lowest parts.

    12, cabin, underground operating conditions, the engine to be installed tail gas treatment device.

    Previous  |  Next  |   Return to
    About Us
    Company profile
    Culture
    Organizational
    Development
    Subsidiaries
    Certificates
    Products
    Wheel Loader
    Block Handling Wheel Loader
    Excavator
    Other
    Spare Parts
    News
    Company News
    Trade News
    Exhibitions
    Videos
    Services
    Marketing
    After Services
    Question
    Downloads
    Recruitment
    Talent Concept
    Jobs
    Contact Us
    Feedback
    Contact us
    Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
    Two-dimensional [Close]

    點擊這里給我發(fā)消息
    點擊這里給我發(fā)消息
    主站蜘蛛池模板: 精品三级在线观看| 99精品国产高清一区二区麻豆 | 在线精品亚洲| 四虎精品影院4hutv四虎| 精品人妻中文字幕有码在线| 欧美在线精品永久免费播放| 国产精品美女网站| 久久久久久久99精品免费观看| 久久精品国产久精国产思思| 人妻无码精品久久亚瑟影视| 国产精品美女免费视频观看| 99精品视频3| 国产精品一区二区久久不卡| 亚洲国产精品日韩| 精品亚洲一区二区三区在线播放| 四虎永久在线精品884aa下载| 97久久精品无码一区二区| 中文字幕无码精品亚洲资源网久久 | 一区二区国产精品| 精品国精品国产自在久国产应用男| 日韩精品www| 久久99热国产这有精品| 99re66热这里只有精品| 精品亚洲成a人片在线观看少妇| 99热热久久这里只有精品68 | 国产精品久久久久一区二区三区| 99视频在线观看精品| 久久久久无码精品国产不卡| 最新国产精品拍自在线观看| 欧美精品色精品一区二区三区| 久久精品亚洲男人的天堂| 国产一区二区精品尤物| 国产综合精品久久亚洲| 精品久久久久中文字幕一区| 国内精品久久久久久久coent| 国产精品无码免费播放| 国产欧美日韩精品专区| 久久国产成人亚洲精品影院| 久久精品国产一区二区三区 | 四虎国产精品永久地址99| 国产成人精品大尺度在线观看|