• <ul id="ysmgw"></ul>
    <ul id="ysmgw"><dfn id="ysmgw"></dfn></ul>
    <fieldset id="ysmgw"><table id="ysmgw"></table></fieldset>
      Homepage      Favorite      中文版
    Home About Us News info Products Services Recruitment Contact us
    NEWS CENTER
    Company News
    Trade News
    Exhibitions
    Videos
    CONTACT US
    Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
    Tel: +86-592-6539999
    E-mail: bussiness@xmzzj.com

    NEWS CENTER
    Location:Home → News Center
    Loader operating specification
    Public date:2017-7-26   Hits:6506

    Good operating habits to extend the life of your equipment doubled

    1, bucket transport height

    ★ illegal operation: with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    ★ standard operation: the fighting state, the bottom of the bucket 40-50 cm off the ground, the slope to minimize.

    2, the operation, should make the loader straight on the front, before and after the frame should be in a straight line.

    3, prohibit the use of inertia high-speed plug into the pile, should rely on the driving force of the loader straight cut.

    4, the bucket cut into the angle is too large, all the load added to the front axle, resulting in the rear wheel vacant, prone to the front axle from the original screw teeth, axle or even the front axle support shaft fracture and other failures.

    5, prohibit the use of bucket corner digging hard materials, or prone to boom deformation, cylinder damage and other failures.

    6, the bucket inserted into the pile, you should first fight and then start the arm, or will cause the boom deformation.

    7, with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    8, can not be carried out in the high digging operations or bucket bump material, so as not to arm arm cylinder bending.

    9, after discharge, should first stop or part of the resumption of operation and then move the arm, otherwise it will cause "pull the cylinder", damage dump tank.

    10, the bucket of the block by a long time due to deformation caused by deformation, wear, the timely repair welding to ensure that the bucket of the block in the normal bar, the discharge position to play an effective limit role.

    ★ If the limit block wear is not timely repair welding, will cause rocker deformation, fracture failure!

    11, wading operations, the water does not exceed the drive axle or gearbox output shaft seal the lowest parts.

    12, cabin, underground operating conditions, the engine to be installed tail gas treatment device.

    Previous  |  Next  |   Return to
    About Us
    Company profile
    Culture
    Organizational
    Development
    Subsidiaries
    Certificates
    Products
    Wheel Loader
    Block Handling Wheel Loader
    Excavator
    Other
    Spare Parts
    News
    Company News
    Trade News
    Exhibitions
    Videos
    Services
    Marketing
    After Services
    Question
    Downloads
    Recruitment
    Talent Concept
    Jobs
    Contact Us
    Feedback
    Contact us
    Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
    Two-dimensional [Close]

    點擊這里給我發消息
    點擊這里給我發消息
    主站蜘蛛池模板: 999精品视频| 精品久久久无码中文字幕天天| 99国内精品久久久久久久| 日韩精品人妻系列无码专区免费 | 拍国产乱人伦偷精品视频| 国产精品福利一区二区| 亚洲乱码国产乱码精品精| 精品国产黑色丝袜高跟鞋| 久久夜色精品国产亚洲| 国产AV午夜精品一区二区三区| 亚洲国产精品va在线播放| 久久久久久久亚洲精品| 99热热久久这里只有精品68| 国产韩国精品一区二区三区久久| 少妇精品久久久一区二区三区| 日本熟妇亚洲欧美精品区 | 精品人妻系列无码人妻免费视频| 精品一卡2卡三卡4卡免费视频| 精品久久久久久成人AV| 无码精品A∨在线观看中文| 一夲道无码人妻精品一区二区| 久久精品国产色蜜蜜麻豆| 国产美女精品视频| 国产999精品久久久久久| 四虎精品成人免费永久| 日韩精品一区二区三区四区| 国产91精品在线观看| 99久久99久久精品免费看蜜桃| 国内少妇偷人精品视频免费| 嫖妓丰满肥熟妇在线精品| 亚洲av永久无码精品漫画| 亚洲国产精品无码久久SM| 在线涩涩免费观看国产精品| 亚洲精品无码国产| 亚洲国产另类久久久精品小说| 亚洲αv在线精品糸列| 精品无码国产一区二区三区AV| 精品无码一区二区三区爱欲| 99久久er这里只有精品18| 久久99热狠狠色精品一区| 91精品国产成人网在线观看 |